Wind Testing with Senors Nov.24-25th

This test ran on Nov. 24-25th was Experiment #A3 which evaluated the system design and temperature profilein the Interlock House for passive heating and natural cooling. Testing started at 2:25pm Nov 24th and ended 4:30pm 25th. The Weather was sunny the 24th and cloudy the 25th. All data collection showed good stratification. Our new radiation shield design is working great.